Kinvara Wastewater Treatment Plant

Kinvara Wastewater Treatment Plant

About the Project:

D Fallon Consulting Engineers (DFCE) were delighted to have been commissioned to act as Civil & Structural designers for this project. DFCE acted as part of a design team which included Ryan Hanley Consulting Engineers & Response Engineering. The main contractor in the project was Source Civil Ltd, who DFCE worked with in several similar projects in the past. The design team worked efficiently in achieving the clients brief in a cost effective & timely manner.

The project consisted of the proposed construction of a control building, RC pumping station, RC inlet manhole and several smaller elements. The site was located close to Kinvara town.

Our Solution: 

DFCE tasks in this project involved:

Design and detail of significant reinforced concrete elements on site. This included full design analysis, draughting and bar scheduling for significant below ground aqueous retaining tanks.

DFCE assisted the Design and Build Contractor to achieve a final product which was extremely cost effective and met fully the requirements set out in the Client’s brief